    • “Heineken Brewery” LLC (OOO “OPH”) for Khabarovsk branch

      NH3 contamination level control system: development of design documentation on NH3 contamination level control and alarm system (phase - detailed design documentation), industrial safety expert review of the project by the Federal Service for Environmental, Technological, and Nuclear Supervision, assembly of control cabinets, supply of equipment, installation and commissioning works.

    • “Heineken Brewery” LLC (OOO “OPH”) for Irkutsk branch

      CO2 level control and alarm system, refitting: development of design documentation on NH3 contamination level control and alarm system (phase - detailed design documentation), assembly of control cabinets, supply of equipment, installation and commissioning works.

    • “PepsiCo Holdings” LLC for FEZ “Sherrizone”

      Supply of equipment, construction/installation and commissioning works.

    • “AVK” LLC (Avtograd-Vodokanal)

      Works on modernization of batching equipment in mixing shop No. 1 with the replacement of dosing pumps Nos. 36, 37, 38, 39 and their automatization at water treatment plant in WTF shop of “AVK” LLC: construction and installation works, commissioning works and putting of equipment into production run.

    • “PepsiCo Holdings” LLC for FEZ “Sherrizone”

      Introduction of reactive power compensation: supply of equipment, electric installation and commissioning works.

    • 2017

    • CJSC Kalugin

      Automated control system and instrumentation for TM drive of BF10 Kalugin hot stove No35.

    • LLC Portenergo

      Modernization of LHCG transshipment complex.

    • 2016

    • NJSC SVEZA Kostroma

      Manufacturing, supply and installation and construction, and commissioning works performance for automatic system of bale of plywood accounting at plywood layup station of Raute firm

    • CJSC Centrgazstroy

      CTS-CE-2000/2.

    • LLC “Zeppelin PS Rus”

      DD development for DPP for the needs of LLC “EGGER DREVPRODUKT GAGARIN”

    • LLC “Infinit Group”

      System for additional cooling of internal water circuit of Weldac induction unit for electric-welded pipes heating, 1700/1500, SNG6 unit for weld double heat treatment and hydroplant of line preparation section at Electric-Weld Pipe Workshop No. 3

    • AO “SPNZ”

      Complex control system for plenum and plenum-exhaust systems